Click for previous Toronto Subway
Class H-5 car 5719
Click for next photo

H-5 car 5719 arriving at Davisville

The Toronto Subway runs on 1495 mm gauged track ( 4' 10 7/8") which is the same as the streetcars. There are 3 lines with the north-south Yonge line being the 1st built in 1954 and it was followed later by the east-west Bloor-Danforth line and recently by the east-west Sheppard.

Class H-5 car 5719 (built by Hawker-Siddeley between 1976 and 1979) arrives at Davisville station on Monday, March 30th, 2009.

BackPhotos from CanadaHomeGalleryLink


Last Updated: July 09, 2017
Mail MeMichael Taylor