Click for previous Toronto Subway
Bombardier TR car 5441
Click for next photo

TTC 5441 southbound at Davisville

The Toronto Subway runs on 1495 mm gauged track ( 4' 10 7/8") which is the same as the streetcars. There are 3 lines with the north-south Yonge line being the 1st built in 1954 and it was followed later by the east-west Bloor-Danforth line and the east-west Sheppard.

Class TR car 5441 (built by Bombardier in August 2011) heading south at Davisville on Saturday, April 8th, 2017.

BackPhotos from CanadaHomeGalleryLink


Last Updated: April 09, 2017
Mail MeMichael Taylor