Click for previous Toronto Subway Click for next photo

5347 at Davisville.

The Toronto Subway runs on 1495 mm gauged track ( 4' 10 7/8") which is the same as the streetcars. There are 3 lines with the north-south Yonge line being the 1st built in 1954 and it was followed later by the east-west Bloor-Danforth line and recently by the east-west Sheppard.

5347 at Davisville station on Monday August 29th, 2005. It was built by Bombardier in 2001 and is classified T1 by the TTC. Seating for 66 it operates as a married pair with 5346.

BackPhotos from CanadaHomeGalleryLink


Last Updated: August 20, 2011
Mail MeMichael Taylor