Click for previous Toronto Subway Click for next photo

Northbound train at the throat.

The Toronto Subway runs on 1495 mm gauged track ( 4' 10 7/8") which is the same as the streetcars. There are 3 lines with the north-south Yonge line being the 1st built in 1954 and it was followed later by the east-west Bloor-Danforth line and recently by the east-west Sheppard.

Northbound subway train departs from Davisville station on Monday August 29th, 2005. One of the frame 2-story houses to survive the subway construction sits near the bridge and is surrounded by high-rise construction.

BackPhotos from CanadaHomeGalleryLink


Last Updated: August 20, 2011
Mail MeMichael Taylor