600 Volt DC Substation   

600 Volt DC Substation

The Southern Electric ran on 600 Volt DC supplied to the conductor rail at various intervals. This one at Glynde was built for the 1935 Eastbourne Electrification and is still serving the railway.

Michael Taylor

Back      Photos from the United Kingdom


Last Updated: January 14, 2009
Michael Taylor